We have completed some very iconic projects which we are proud to headline on our main project page.
We have also completed hundreds of less well known projects over our 20 year trading period, all of which remain equally important to us. To see examples of our other projects, employers and services please select by "Service Type" using the button below;
Project | Description | Employer | Sector | Operation | Service | Detail | Size(M2) |
---|---|---|---|---|---|---|---|
Heathrow Airport, Terminal 2 | MEP Design & Specification & Construction delivery lead for new T2A Terminal | Heathrow Airport Limited | Transport | Aviation | Technical Project Management | Provide the technical MEP Project management services for the delivery of this brand new terminal at London Heathrow Airport. Providing a full time role based at the client project offices we were the prime MEP delivery lead responsible for ensuring Heathrow Airport Ltd's requirement associated with the MEP services were delivered. | 310000 |
MEP Delivery Lead | Capital Projects EMEA Delivery lead | Goldman Sachs | Commercial | Finance | Technical Project Management | MEP technical services manager leading delivery of all MEP elements of the capital projects delivery programme throughout all of the banking offices within EMEA. | 200000 |
Battersea Power Station Development - Phase 2 - Main Power Station | Phase 2 - Main Power Station - MEP Technical Services Manager | Battersea Power Station Development Company | Commercial | Mixed Use | Technical Project Management | MEP Technical Managers for the Battersea Power Station Phase 2 main power station development. Based in the client project offices providing MEP design and delivery technical oversight and advisory for the Development Manager Battersea Power Station Development Company. | 130000 |
Shard | Technical project management of design and construction | Qatari Diar | Commercial | Mixed Use | Technical Project Management | We provided technical MEP project management for the Shell and Core construction of the Shard tower and London Bridge Station concourse, providing direct input into the design and build aspects of the project to ensure the client expectations were met within programme and budget. | 125000 |
Royal Botanic Gardens, Kew | MEP condition survey | Kew | Leisure | Mixed Use | Survey | To carry out MEP condition survey of condition rated 3,4,5 assets from LCR asset sheet for all buildings across the Kew Garden estate. 229 Buildings across 1.32Ha. | 110106 |
Royal Botanic Gardens, Kew - Infrastructure Survey Phase 1 | Kew estate main infrastructure survey | Kew | Leisure | Parks | Survey | Desktop review of all available infrastructure record drawing information, as a Phase 1 part to a 4 Phase end to end infrastructure survey. The estate surveyed comprises of 229 buildings with a total floor area of 110,106M2 across 132Ha of land. | 110106 |
British Airways World Cargo Fire Alarm Replacement | MEP technical project management for fire alarm replacement project | British Airways | Transport | Aviation | Technical Project Management | MEP project management for the delivery of main fire alarm replacement to the entire World Cargo Distribution Centre at Heathrow airport. | 90000 |
Peninsula Hotel London | Design Management for Stage C-F | 1-5 GP LLP (Grosvenor/Hong Kong & Shanghai Hotels) | Hospitality | Hotel | Technical Project Management | Provide technical MEP design management services to deliver a Stage 4a design and tender package for this prestigious new London hotel at Hyde Park Corner, London. The JV client was so pleased with our delivery performance, and highlighting the importance of a strong MEP biased design management team, our role was extended to manage the whole design team. | 70000 |
HMRC Building Surveys - 10Nr batch | MEP LCR Asset Survey | Mapeley Estates | Public Services | Offices | Survey | To carry out LCR surveys for the Mechanical, Electrical & Building fabric elements of the 10 Nr key landmark buildings including Somerset House and Custom House London and provide life cycle replacement plan using LCR asset template system. | 51150 |
Calderdale School Surveys | MEP Asset Surveys for PFI tenderers | Calderdale Council | Education | Schools | Survey | Warranted life cycle asset replacement surveys for ##Nr of existing schools within the Calderdale education authority to form part of a PFI tender package. | 40132 |
Castle Meadow, Nottingham | MEP LCR Asset Survey | Government Department | Commercial | Offices | Survey | To carry out LCR surveys for the Mechanical, Electrical & Building fabric elements of the large Nottinghamshire campus and provide life cycle replacement plan using LCR asset template system. | 39000 |
Bracken House, London | MEP Design & Construction Management for Cat A & Cat B fit-out | Obayashi Corporation | Heritage | Offices | Technical Project Management | Provide design management for the MEP services within the main contract managing the MEP Designers Arup and the acceptance of the Contractor production information from McLaren / Skanska, to deliver an internal grade A office space within this grade 2 listed building. In parallel deliver Cat B fit-out for incoming tenant Financial Times. | 27000 |
Kingswood House | Life Cycle Replacement survey | Southwark Council | Public Services | Offices | Survey | Life cycle Replacement asset survey. Compilation of LCR 25 year replacement schedule. | 24206 |
160 Tooley Street | Building Fabric LCR Asset Survey | Southwark Council | Public Services | Offices | Survey | Carry out asset LCR schedule of building fabric for Tooley St Offices. | 24206 |
Royal Botanic Gardens, Kew -Quinquennial Phase 1 | Quinquennial Phase 1 survey update | Kew | Leisure | Parks | Survey | Carry out quinquennial condition survey of Kew Garden estate buildings. Updating existing reports and generating new where none exist. | 23050 |
Southwark Council Life Cycle Replacement Survey (31Nr) | Building Fabric LCR Asset Survey | Southwark Council | Public Services | Mixed Use | Survey | Carry out asset survey and prepare LCR schedule of MEP services for 31No. buildings within the Southwark council estates portfollio. | 23041 |
Southwark Council Life Cycle Replacement Survey (31Nr) | MEP LCR Asset Survey | Southwark Council | Public Services | Mixed Use | Survey | Carry out asset survey and prepare LCR schedule of MEP services for 31No. buildings within the Southwark council estates portfollio. | 23041 |
Royal Botanic Gardens, Kew - Quinquennial Phase 2 | Quinquennial Phase 2 survey update | Kew | Leisure | Parks | Survey | Carry out quinquennial condition survey of Kew Garden estate buildings. Updating existing reports and generating new where none exist, including FMR update for 22Nr buildings. | 22823 |
BMI Hospital Condition Surveys | MEP & Building Fabric Condition survey | General Healthcare Group Ltd | Healthcare | Hospital | Survey | Carry out MEP & Building fabric condition survey plus ACI & EPC surveys for General Healthcare Group Ltd at Garden Hospital Hendon, Harbour Hospital Poole, Lancaster, Huddersfield, Sloane, & Longfield. | 21810 |
BMI Hospital Condition Surveys | MEP & Building Fabric Condition survey - Phase 2 | General Healthcare Ltd | Healthcare | Hospital | Survey | Carry out MEP & Building fabric condition survey plus ACI & EPC surveys for General Healthcare Group Ltd at Cavell Hospital Enfield, Lincoln Hospital, Beardwood Hospital Preston, Bury St Edmunds, Esperance Hospital Eastbourne, & Edgbaston Hospital Birmingham. | 20190 |
Printing Square House, Guildford, Surrey | Survey and CAD drawing production | Atkins | Residential | Existing | Survey | Survey all landlord areas and produce CAD drawings of as installed installation arrangement including detailed riser elevations. Information to be used as template for heating system remedial work project. | 20000 |
Royal Botanic Gardens, Kew - Quinquennial Phase 3 | Quinquennial Phase 3 survey update | Kew | Leisure | Parks | Survey | Carry out quinquennial condition survey of Kew Garden estate buildings. Updating existing reports and generating new where none exist. | 15873 |
River Plate House | MEP Construction and Record Drawing production | Nomura Bank | Commercial | Finance | CAD/BIM | Development of employers requirements drawings into construction and record CAD drawings. | 13475 |
River Plate House | MEP Construction and Record Drawing production | Nomura Bank | Commercial | Finance | Design & Build | Development of employers requirements layouts into construction and record drawings. | 13475 |
River Plate House | MEP scope of Works and cost plan | Taisei Europe Ltd | Commercial | Offices | Technical Advisory | Preparation of MEP scope of works and associated cost plan. | 13475 |
Royal Courts of Justice - Queens Building | MEP condition survey | Court Service | Heritage | Courts | Survey | Carry out MEP condition survey of the Queens building within the Royal Courts of Justice. | 13156 |
ACE Europe, 100 Leadenall Street | MEP LCR Asset Survey | ACE Insurance Europe | Commercial | Insurance | Survey | Preparation of Mechanical & electrical Asset data collection sheets and risk reports. | 11113 |
Bracken House - MHCB 4th Floor Relocation | MEP Cat B fit-out & MER refurbishment | Mizhuo Bank | Commercial | Banking | Design & Build | Preparation of electrical services construction design and drawings for MHCB & MCML Relocation to 4th Floor Bracken House. Including works on 4th, 1st, Grd, LGrd and Basement levels. | 10860 |
Novartis Pharmaceutical, Frimley, Surrey - Space 2003 | MEP Design | Novartis Pharmaceutical | Healthcare | Offices | Design & Specification | Preparation of electrical & mechanical services tender package, incl employers requirement document, CAD drawings, Cost Plan and specifications for new Cat B fit-out of main UK head offices. | 8595 |
ACE Europe, Ashdown House, Crawley | MEP LCR Asset Survey | ACE Insurance Europe | Commercial | Insurance | Survey | Preparation of Mechanical & electrical Asset data collection sheets and risk reports. | 7500 |
ACE Europe, Ashdown House, Crawley - Infrastructure Upgrade | MEP Design - Services Infrastructure Upgrade | ACE Insurance Europe | Commercial | Offices | Design & Specification | MEP design for building services infrastructure refurbishment within live operational environment, including new main LV switchpanel, LV sub-main distribution, backup diesel generator, UPS | 7500 |
Battersea Power Station Development - Main Energy Centre | Main Energy Centre MEP Project Management | Battersea Power Station Development Company | Industrial | Energy Centre | Technical Project Management | MEP technical project management of the MEC (Main Energy Centre). Working closely with principle design and build contractor Vital Energi to deliver this high profile piece of infrastructure with numerous key dates and interfaces enabling the success of the other phases of the development. | 7300 |
Triad Bootle | MEP LCR Asset Survey | Government Department | Public Services | Offices | Survey | To carry out LCR surveys for the Mechanical, Electrical & Building fabric elements of the 19 Storey building and provide life cycle replacement plan using LCR asset template system. | 7200 |
Peterborough Court Compliance | Technical project management of Basement fire compliance work | Goldman Sachs | Commercial | Finance | Technical Project Management | MEP technical project management of Basement area fire compliance work comprising full replacement of smoke extract system throughout the extensive basement areas of a London headquarters building in a live operational banking environment. | 5865 |
Eastbury High School | MEP LCR Asset Survey | Eastbury High School | Education | Schools | Survey | Carry out site survey of Mechanical & electrical & building fabric installations to complete LCR asset data input exercise. | 5850 |
Barnet Council Offices | MEP condition survey | Barnet Council | Public Services | Offices | Survey | Carry out condition survey of Mechanical & electrical services at Barnet Council Offices and produce report and budget costings for proposals. | 5120 |
Safeline New Kiafield Development, Royston, Herts | Peer review of Stage 4 MEP tender package | Mettler Toledo | Industrial | Science | Technical Advisory | Carry out a peer review of an existing Stage 4 Design & Specification and identify gaps and value engineering opportunities to align with project budget and be carried through into construction. | 4890 |
T Mobile - Retail Stores (45Nr) | Store AC refurbishment roll out programme | T Mobile | Retail | High Street Store | Technical Advisory | Carry out survey, report / outline employers requirement document, analyse tender returns and sign off completed installation of new cooling systems for 45No. branches throughout UK. | 4500 |
Harrogate | Building Fabric condition survey | General Healthcare Group Ltd | Healthcare | Hospital | Survey | Carry out Building fabric condition survey and hand marked measured survey for General Healthcare Group Ltd at Queens Road Harrogate. | 4175 |
Queens Road Peckham | MEP & Building Fabric Pre-aquisition survey | Southwark Council | Public Services | Offices | Survey | Carry out MEP and building fabric condition survey to inform pre-aquisition stage on 2Nr new buildings to be added to estate. | 4130 |
Standard Bank, 20 Gresham Street, London | Record drawing production | Standard Bank | Commercial | Finance | CAD/BIM | Preparation of CAD record drawings based on handmark ups received. | 3685 |
Bracken House | MEP Design development | Obayashi Corporation | Commercial | Finance | Design & Build | Development of employers requirement document into production drawings and procurement of critical path PDU equipment | 3565 |
Bracken House | MEP Construction and Record Drawing production | Obayashi Corporation | Commercial | Offices | Design & Build | Preparation of construction and record drawing CAD information for 5th floor refurbishment. | 3565 |
Eastern Road, Romford | MEP Design | Developer | Commercial | Offices | Design & Build | Preparation of electrical services scheme for new office block in Romford including CAD drawings, specification. | 3000 |
Honda Motors, Caversham | MEP Design - Office Fit-out | Honda Motors | Commercial | Offices | Design & Build | Design development and preparation of construction CAD drawings for new office fit-out floors G-3 | 2670 |
Honda Motors, Caversham | Record drawing production | Honda Motors | Commercial | Offices | CAD/BIM | Preparation of record drawings based on hand mark ups received. | 2670 |
KBC Technology Ltd, 42-45 Hersham Road, Walton on Thames | Record drawing production | KBC Technology Ltd | Commercial | Offices | CAD/BIM | Preparation of 13Nr CAD record drawings based on hand mark ups received. | 2610 |
Capstan House, East India Dock - 4th Floor | MEP Design for data centre | Guardian IX | Technology | Data Centre | Design & Build | Electrical design for 1.5MVA data centre | 2500 |
Mid City Place, 71 High Holborn | MEP Design - Cat B fit-out | Westfield | Commercial | Offices | Design & Build | Preparation of mechanical & electrical services scheme layout drawings for fit-out at 6th floor Mid City Place. | 2500 |
Syngenta, Building Nr102 | Record drawing production | Syngenta | Pharmaceutical | Laboratories | CAD/BIM | Survey existing installation arrangements and produce record drawing information in CAD format, 10Nr drawings in total. | 2410 |
Phillips House, Tunbridge Wells | MEP Design | PPP Healthcare | Commercial | Offices | Design & Specification | Preparation of Electrical services design for PPP Healthcare offices in Tunbridge Wells. Full refurbishment of grd to 2nd floors including all main LV switchgear, rising distribution and comms facilities. | 2344 |
Syngenta, Building Nr23 | Record drawing production | Syngenta | Pharmaceutical | Laboratories | CAD/BIM | Preparation of record drawings for the electrical services at Syngenta Building 23 Area. | 1980 |
Kodak House , Headquarters, Hemel Hempstead | MEP Design | Kodak | Commercial | Food & Beverage | Design & Specification | Preparation of Mechanical & Electrical services Stage E documentation for new restaurant and conference room facility on 2nd floor of UK headquarters building. | 1800 |
Romford County Court | MEP condition survey | Court Service | Public Services | Courts | Survey | Carry out survey and provide report on controls system at Romford County Court. | 1730 |
Aldwych House, London | MEP Construction and Record Drawing production | Associated British Ports | Commercial | Offices | CAD/BIM | Preparation of MEP construction and record CAD drawings for Grd floor fit-out. | 1525 |
ACE Europe, Ashdown House, Crawley | MEP Design - Data Centre refurbishment | ACE Insurance Europe | Commercial | Offices | Design & Specification | Preparation of electrical services tender package for Grd floor computer room re-furbishment. | 1500 |
ACE Europe, Ashdown House, Crawley | MEP Design - Ground Floor HR Offices fit-out | ACE Insurance Europe | Commercial | Insurance | Design & Specification | Preparation of Mechanical & electrical services scheme layout drawings and production of record drawings for Ground floor HR area. | 1500 |
40-66 Queen Victoria Street- 6th Floor | MEP Scope of Works | Universal Access | Commercial | Offices | Technical Advisory | Prepare outline scope of works for tender bid purposes. | 1500 |
40-66 Queen Victoria Street- 6th Floor | MEP Design | Williams | Commercial | Offices | Design & Build | Preparation of documented client brief, outline scope of works, and scheme layout drawings for costing exercise of Williams, Queen Victoria Street, Morgan Lovell Synergy project. Production of scheme layout CAD drawings and record drawings for construction stage of project, in accordance with agreed ML Synergy works. Additional site meeting attendances. | 1500 |
ACE Europe, Ashdown House, Crawley | MEP Design | ACE Insurance Europe | Commercial | Offices | Design & Specification | MEP design and specification for 1st floor Cat B refurbishment and comms room cooling power upgrade. | 1500 |
Cinnamon Club, Westminster | Record drawing production | Indian Restaurants Ltd | Hospitality | Food & Beverage | CAD/BIM | Preparation of Record drawings based on hand mark ups received. | 1290 |
Royal Courts of Justice - Gymnasium | MEP Design | Court Service | Heritage | Courts | Design & Specification | MEP design for basement vault conversion into high specification gymnasium, treatment rooms and locker room facilities. Within the basement of the main building. | 1250 |
Royal Courts of Justice - Gymnasium | MEP scope of Works and cost plan | Court Service | Heritage | Courts | Technical Advisory | Prepare MEP outline scope of works and cost plan for Basement vault gymnasium re-furbishment. | 1250 |
Norfolk House, Gatwick Airport | MEP Design and record drawings for office refurbishment | HQ Global Workspaces | Transport | Aviation | Design & Build | Full MEP refurbishment of 7th floor office space at Norfolk House within Gatwick airport. | 1140 |
33 Old Broad Street | Construction & Record drawing production | Developer | Commercial | Offices | CAD/BIM | Preparation of production and record CAD drawings for Cat B fit-out. | 1113 |
Digitas, Alfred Place, London WC1 | MEP Design | Digitas | Commercial | Offices | Design & Build | Full MEP refurbishment of 1st floor office space Preparation of 10Nr electrical services Stage 5 design drawings. | 1050 |
Park Crescent | Survey and CAD update | Developer | Commercial | Offices | CAD/BIM | Carry out survey of existing internal partition arrangements throughout building, and modify existing CAD drawings accordingly, to required layering standards | 1013 |
Fine Fragrance, Dolphin Industrial Estate | Post Tender construction support | Fine Fragrances & Cosmetics Ltd | Industrial | Warehouse | Technical Advisory | Post tender construction services, site meetings, site inspections, contract administration, final inspections and handover. | 1000 |
Infiniti Car Showrooms | Car showroom condition surveys | Infinity Cars | Commercial | Car Showrooms | Technical Advisory | Carry out MEP and building fabric condition surveys of existing prestigious car showrooms in Birmingham, Leeds, Stockport and Glasgow. The surveys were used as pre-acquisition documents informing leaseholder purchase of freehold title. The reports provided condition narrative, dilapidation schedules, risk registers and ongoing maintenance liabilities. | 1000 |
Fine Fragrance, Dolphin Industrial Estate | MEP Design | Fine Fragrances & Cosmetics Ltd | Industrial | Warehouse | Design & Specification | Preparation of mechanical & electrical services performance specification for re-furbishment and fit-out of new warehouse and office premises at Sunbury-on-Thames. | 1000 |
BT Sport - Stratford | Kitchen & Restaurant refurbishment | BT Sport | Hospitality | Food & Beverage | Design & Build | Electrical design for a new 200 cover food and bevarage provision within BT sport broadcasting facility. | 960 |
Sanwa & IBJ Bank, Mid City Place | Construction and Record drawing production | Sanwa & IBJ Bank | Commercial | Finance | Design & Build | Preparation of electrical scheme layout CAD drawings for construction and record purposes. Space plan churn for Levels 7 & 9 including new comms room facility. | 830 |
Tate & Lyle, Silvertown | Record drawing production | Tate & Lyle | Commercial | Offices | CAD/BIM | Preparation of CAD record drawings based on hand mark ups received. | 830 |
Tate & Lyle, Silvertown | Domestic services and gas design for new staff restaurant | Tate & Lyle | Commercial | Offices | Design & Build | Full MEP refurbishment of staff restaurant within Tate & Lyle offices. | 830 |
200-206 Regent Street, London | MEP Record drawing CAD/BIM Service | The Crown Estate | Commercial | Offices | CAD/BIM | Full MEP refurbishment of 5th floor office space. Preparation of 4Nr electrical record drawings based on hand marked up design layouts received. | 750 |
Fitzroy Square, London | Building Fabric condition survey | General Healthcare Group Ltd | Healthcare | Offices | Survey | Carry out Building fabric condition survey for General Healthcare Group Ltd at Fitzroy Square, London. | 750 |
Bentley Systems, 20 Gracechurch Street | MEP Record drawings | Bentley Systems | Commercial | Offices | CAD/BIM | Preparation of CAD Record drawings based on hand mark ups received. | 740 |
Microrent Ltd - Gateway Centre | Record drawing production | Microrent Ltd | Commercial | Offices | CAD/BIM | Preparation of MEP record drawings based on hand mark ups received. | 713 |
Vintners Place, 5th Floor | Record drawing production | Taisei Europe Ltd | Commercial | Finance | CAD/BIM | Preparation of mechanical & electrical record drawings in CAD format. | 700 |
Barham Primary School, Danethorpe Road, Wembley | MEP Design for new sports hall and music rooms | London Borough of Brent | Education | Schools | Design & Build | MEP design and production CAD drawings for new sports hall and music room facility on existing school aite. | 700 |
66 Wilson Street, London EC2A 2JX | Review of Fit-out works and impact on operations | VFS | Commercial | Offices | Survey | Provide a condition survey report on the impact of the Ground and 2nd floor fit-out works on the MEP building services. | 600 |
Verulam Gardens, 70 Grays Inn Road | MEP Record drawings | Aberdeen Property Investors | Commercial | Offices | CAD/BIM | Preparation of CAD record drawings based on hand mark ups received. | 590 |
Cleveland House | MEP Design | Elliott Management (UK) Ltd | Commercial | Offices | Design & Build | Preparation of scope of works and electrical load schedule for; Full MEP fit-out of 4th floor office space. | 560 |
City Point, One Ropemaker Street EC2 - L26 | MEP Design | Elliott Management (UK) Ltd | Commercial | Offices | Design & Build | Preparation of scope of works and electrical load schedule for; Full MEP fit-out of 26th floor office space. | 560 |
Ransomes Dock, London SW11 4NP | Pre-acquisition survey | TIGI | Commercial | Offices / Salon | Survey | MEP due diligence survey of the new Ground floor tenant space to suit the fit-out works for a new head office and hair salon facility, used for pre-acquisition purposes. | 550 |
87 Worship Street | MEP production of scheme for tender | Cripplegate Foundation | Commercial | Offices | Design & Build | Preparation of scheme layouts based on employers requirements document to assist in tender bid. Attendance at tender interviews. | 550 |
Ransomes Dock, London SW11 4NP | New head office and salon Cat B fit-out | TIGI | Commercial | Offices / Salon | Design & Specification | Provide MEP Design & Specification and specification for the fit-out of a new head office and salon facility. | 550 |
Centurion House - 7th Floor | Record drawing production | Nomura Property Management | Commercial | Offices | CAD/BIM | Preparation of 4Nr MEP drawings based on hand marked up design layouts received. | 540 |
Centurion House - 5th Floor | Record drawing production | Nomura Property Management | Commercial | Offices | CAD/BIM | Preparation of 4Nr MEP drawings based on hand marked up design layouts received. | 540 |
Queensmead Health Centre | Record drawing production | Queensmead Health Centre | Healthcare | Surgery | CAD/BIM | Preparation of record drawings based on hand mark ups received. | 513 |
Chicago | Record drawing production | Chicago | Commercial | Offices | CAD/BIM | Creation of MEP record drawings based on site mark ups received. | 513 |
Beehive Building | MEP scope of Works and cost plan | Developer | Commercial | Offices | Design & Build | Preparation of electrical scheme layout arrangements and budget costs for tendering purposes. | 500 |
Syngenta, Building Nr100 | CAD Services | Syngenta | Pharmaceutical | Laboratories | CAD/BIM | Modification of existing CAD files, building, mechanical & electrical record drawings to conform with Syngenta layering standards. | 450 |
ACE Bowater House - 14th Floor | MEP Design and record drawings for office refurbishment | Allied Commercial Exporters | Commercial | Offices | Design & Build | Full MEP refurbishment of 14th floor office space Preparation of 4Nr MEP services scheme layout drawings. | 425 |
ACE Bowater House - 14th Floor | Record drawing production | ACE | Commercial | Offices | CAD/BIM | Full MEP refurbishment of 14th floor office space. Preparation of 4Nr MEP record drawings based on hand marked up design layouts received. | 425 |
ACE Europe, Kent House, Romney Place | MEP Inspection and report | ACE Insurance Europe | Commercial | Insurance | Survey | Site visit and preparation of mechanical services report, conclusions and recommendations on the cooling problems within the telephone room. | 413 |
Hawbank House, Cheadle | Building Fabric Dilapidation Survey | General Healthcare Group Ltd | Healthcare | Offices | Technical Advisory | To carry out a site inspection, record as existing condition, read the lease and ascertain appropriate repair clauses and advise on likely dilapidation liabilities for Hawbank House, High Street, Cheadle | 400 |
80 Anchorage Point - Flat 80, Westferry Road, London E14 | MEP Design and record drawings for residential fit-out. | Private Residence | Commercial | Offices | Design & Build | JDZ First project! Full MEP refurbishment of duplex apartment within London Docklands Preparation of electrical services scheme layout, and drawings. Sub-main survey. Preparation of mechanical and public health drawings. Attendance at client meeting and incorporation of revised GA's and approval comments | 300 |
80 Anchorage Point | Record drawing production | Private Residence | Residential | Private Housing | CAD/BIM | Preparation of Record drawings for completed design and construction project. | 300 |
Sand Bar, London SW4 | MEP Design for new wine bar | Henry Squire | Hospitality | Private Club | Design & Build | MEP design and tender documentation for new high specification wine bar in Clapham. | 260 |
Royal Courts of Justice - Gymnasium Phase 2 | MEP Design | Court Service | Public Services | Courts | Design & Specification | Following successful design and delivery of the main gymnasium conversion we were appointed to complete the MEP design and tender package, site supervision and handover of Phase 2 gymnasium expansion project. | 250 |
ACE Europe, Brussels Office | MEP Design | ACE Insurance Europe | Commercial | Insurance | Design & Specification | Preparation of electrical services lighting scheme to boardroom and central office area at Brussels office. | 250 |
Hardy House Beak Street | Electrical services design and record drawings for office refurbishment | Obayashi Corporation | Commercial | Offices | Design & Build | Following successful scope and cost plan tender submission and subsequent contract award; Full MEP refurbishment of 4th floor office space | 250 |
Hardy House Beak Street - 4th floor | Electrical services scope of work and cost plan | Obayashi Corporation | Commercial | Offices | Technical Advisory | Electrical services scope of work and cost plan for full MEP refurbishment of 4th floor office space. | 250 |
BMI - Mount Alvernia Hospital, Guildford, Surrey | Structural survey of carpark leak into basement switchroom | BMI Healthcare | Healthcare | Hospital | Survey | Investigate water ingress into basement main LV switchroom from external ground floor car park above and provide conclusion and recommendations on remedial works. | 216 |
97 Oakley Street | Record drawing production | Developer | Commercial | Offices | CAD/BIM | Preparation of domestic services schematic drawings. | 213 |
Imperial College | MEP Record drawing CAD/BIM Service | Imperial College | Education | University | CAD/BIM | Preparation of 1Nr electrical record drawings based on hand marked up design layouts received. | 210 |
20 King Street - 4th floor | Record drawing production | Taiyo Life international (UK) | Commercial | Offices | CAD/BIM | Full MEP refurbishment of 4th floor office space. Preparation of 2Nr electrical record drawings based on hand marked up design layouts received. | 210 |
184-192 Drummond Street, London NW1 3HP | Record drawing production | Alliance Communications | Commercial | Offices | CAD/BIM | Preparation of MEP record drawings based on hand mark ups received. | 200 |
Royal Courts of Justice - Court 26 | MEP Design | Court Service | Public Services | Courts | Design & Specification | Preparation of MEP design and tender documentation for conversion of Court 26 into a coffe shop. | 125 |
Royal Courts of Justice - Court 26 | MEP scope of Works and cost plan | Court Service | Heritage | Courts | Technical Advisory | Prepare MEP outline scope of works and cost plan for Court 26 conversion to a coffee shop. | 125 |
Zeneca, Building 25, Coach House, Jealotts Hill | MEP Design | Zeneca | Pharmaceutical | Laboratories | Design & Build | Full MEP refurbishment of Grd floor office space. Preparation of MEP services scheme layout and drawings | 120 |
Fleet Services | MEP Design | Fleet Recovery | Transport | Workshop | Design & Specification | Electrical design for new motorway service station, Fleet, Hampshire | 100 |
Preston Manor Science Block | Record drawing production | Preston Manor High School | Education | Schools | CAD/BIM | Preparation of working & record CAD drawings for mechanical & electrical services. | 90 |
Kodak House , Headquarters, Hemel Hempstead | Lighting compliance survey | Kodak | Commercial | Offices | Survey | Preparation of lighting report for Tower Block, Kodak Hemel Hempstead, regarding CIBSE LG3 Addendum 2001 compliance. | 90 |
Financial Times, 1 Southwark Bridge Road | MEP design and specification | Financial Times | Commercial | Offices | Design & Specification | Preparation of MEP design, specification and CAD drawings for main reception refurbishment. | 80 |
Barham Primary School, Danethorpe Road, Wembley | MEP Design - New Servery | London Borough of Brent | Education | Schools | Design & Build | Preparation of production layouts and CAD drawings for the Mechanical & Electrical Services for a new kitchen servery. | 60 |
TIB Room - Chiswick Police Station | Conversion of existing space into new TIB room | Metropolitan Police Service | Public Services | Police Station | Design & Specification | Survey existing space and produce; Condition Survey Report, new space plans and MEP Services drawings and scope of works documents for conversion of existing space into new Telephone Investigation Bureau offices | 55 |
Novartis Pharmaceutical, Frimley, Surrey - Computer Suite | MEP Design for computer suite refurbishment | Novartis Pharmaceutical | Pharmaceutical | Offices | Design & Specification | Preparation of mechanical & electrical tender documentation for Novartis computer suite works at Frimley Business Park. | 50 |
Syngenta, Building Nr23 | Record drawing production | Syngenta | Pharmaceutical | Offices | CAD/BIM | Preparation of record drawings for the electrical services at Syngenta Building 23 new Foyer Lighting | 50 |
Triad Bootle - Tank Replacement | MEP Design for main water tank replacement | Mapeley Estates | Commercial | Offices | Design & Specification | Preparation of tank replacement tender documents within this 19 storey building, including all necessary site visits. Analyze tender returns, and provide technical support to contract appointment. | 50 |
Syngenta, Building Nr 173 & 175 | Record drawing production | Syngenta | Pharmaceutical | Laboratories | CAD/BIM | Preparation of electrical CAD drawings for project. | 40 |
Mapeley Surveys 60 Bldgs | LCR Software (Pioneer) development | Mapeley | Public Services | Offices | Survey | Testing and development of Pioneer Life Cycle Replacement software | 0 |
Shipley Data Centre | UPS replacement options study | Government Department | Technology | Data Centre | Technical Advisory | Carry out option appraisal study for UPS replacement at AO Shipley. | 0 |
DFID Congo | MEP Desktop Review of Installation | DFID Congo | Public Services | Offices | Technical Advisory | MEP desktop review of mechanical services installation and suitability of the new system to meet the client requirements. | 0 |
Civil Justice Centre | MEP Consultancy | Court Service | Public Services | Courts | Technical Advisory | Preparation of environmental report for 1st floor office area. | 0 |
Clerkenwell & Wandsworth County Courts | MEP design cost plan advice | Court Service | Public Services | Courts | Technical Advisory | Provide MEP scope of work and cost plan for remedial work arising. | 0 |
University of Brighton | Building Surveying work | University of Brighton | Education | University | Technical Advisory | Provide building surveyor on site advisory role. | 0 |
Euston Tower, L32 | Acting as Landlord Agent to accept tenant license to alter | Mapeley Estates | Commercial | Offices | Technical Advisory | Review tenant proposals for fit-out works within L32 of Euston Tower. Acting as Landlord agent providing acceptance of work on behalf of Landlord for license to alter within the constraints of the building infrastructure. | 0 |
ACE Europe, 100 Leadenhall Street | Lighting control report and training | ACE Insurance Europe | Commercial | Insurance | Technical Advisory | Preparation of electrical services lighting control system report incl attendance at client training session with manufacturer. | 0 |
Cumbernauld Printer Deployment | MEP project management of large format printer deployment | Government Department | Public Services | Offices | Technical Advisory | Project Management of the new colour printer being installed within the Print & Production area within St Mungo’s, Cumbernauld. | 0 |
Royal Botanic Gardens, Kew - Infrastructure Survey Phase 2 | Kew estate main infrastructure survey | Kew | Leisure | Parks | Technical Advisory | MEP analysis and CAD services as Phase 2 part to a 4 Phase end to end infrastructure survey. The estate surveyed comprises of 229 buildings with a total floor area of 110,106M2 across 132Ha of land. | 0 |
Kingsmill Hospital | MEP Audit of facilities services provision | Kingsmill Hospital Trust | Healthcare | Hospital | Technical Advisory | Carry out an audit of the Quality of the MEP services maintenance service level provision being provided by the Facilities Services supplier at the Kingsmill Hospital site. | 0 |
ACE Europe, Ashdown House, Crawley | MEP Consultancy | ACE Insurance Europe | Commercial | Insurance | Technical Advisory | Inspection of 3rd floor mechanical services. | 0 |
Voltage Optimisation Study (4Nr buildings) | MEP Appraisal report on Voltage Optimisation Schemes | Government Department | Public Services | Offices | Technical Advisory | Prior to switching on the Voltage Optimisation equipment provide feasibility studies for each site ensuring that for each installation of Voltage Optimisation equipment there is no risk to services/safety and to ensure that there is no negative impact e.g. loss of current site resilience/flexibility. AO Cumbernauld Scotland, Ty Glas Cardiff, Albert Bridge House Manchester, Alexander House Southampton. | 0 |
Triad Bootle - Discrimination Study | MEP Inspection and report on LV netwrok protection discrimination | Mapeley Estates | Commercial | Offices | Technical Advisory | Preparation of Landlord main LV distribution discrimination survey and report and recommendations for issues arising for this 19 storey building, at Triad Bootle. | 0 |
Citadel - Matrix EC3 | MEP scope of Works and cost plan | Citadel | Commercial | Offices | Technical Advisory | Preparation of MEP outline scope of works and cost plan for office fit-out. | 0 |
Alexander House - Decommission | Decommision and disposal of primary data centre plant | Government Department | Technology | Data Centre | Technical Advisory | Preparation of scope of works for the safe de-commissioning and disposal (including asset value salvage) of 1Nr 1MVA diesel generator and 2Nr 240kVA static UPS inverters and associated battery strings. | 0 |
Davies Street, London | Over Site Development Stage 4 MEP tender package peer review | Developer | Commercial | Offices | Technical Advisory | Carry out a peer review of an existing Stage 4 Design & Specification prior to issue to tender and advise on gaps and changes recommended to provide a robust submission. | 0 |
Kodak, Headquarters, Hemel Hempstead | MEP scope of Works and cost plan | Kodak | Commercial | Offices | Technical Advisory | Preparation of electrical services budget cost plan and accompanying CAD drawings. | 0 |
Syngenta, Building Nr161 | MEP scope of Works and cost plan | Syngenta | Pharmaceutical | Laboratories | Technical Advisory | Preparation of MEP scope of works and associated cost plan. | 0 |
Hackney Walk, London | Urban development advisory | Developer | Commercial | Mixed Use | Technical Advisory | MEP advisory support to master planning. | 0 |
Shipley Data Centre | UPS alternative options | Government Department | Technology | Data Centre | Technical Advisory | Feasibility report on various UPS replacement options for large live government department data centre. | 0 |
Hammersmith Palais Student Accomodation | MEP technical support during construction stage | Developer | Residential | Mixed Use | Technical Advisory | Provide MEP technical support through on site inspections of construction progress and quality and provide advice on opportunities to expedite programme delivery. | 0 |
Shipley Data Centre | UPS Option Study - Further Options | Government Department | Technology | Data Centre | Technical Advisory | Carry out further option appraisal study for UPS replacement at AO Shipley. | 0 |
CAD Standards | CAD Services | Developer | Commercial | Offices | CAD/BIM | Provide CAD standards to office. | 0 |
Grove House | MEP scope of Works and cost plan | Alcatel | Technology | Offices | Technical Advisory | Prepare MEP scope of works and cost plan based on employers requirement document for tender bid purposes. | 0 |
Royal Botanic Gardens, Kew - FMR Update | Desktop update of FMR schedules | Kew | Leisure | Parks | Technical Advisory | Desktop review and update of FMR planning documents. | 0 |
Royal Botanic Gardens, Kew - Boundary wall survey | Building condition survey of perimeter boundary wall | Kew | Leisure | Parks | Survey | Carry out inspection of perimeter boundary wall of the Kew Gardens estate. | 0 |
Alexander House, Southend, Essex | Option appraisal study for existing generator and UPS | Government Department | Technology | Data Centre | Technical Advisory | Carry out option appraisal study for the de-commissioning of existing Generator and UPS distribution systems and asset disposal. | 0 |
Heston Lease | Building Fabric Dilapidation Survey | General Healthcare Group Ltd | Healthcare | Offices | Technical Advisory | Review the agreed schedule of conditions. Carry out a visual inspection of the external and internal building fabric. Prepare a dilapidation report with budget costs, based on the visual inspection. | 0 |
Thameside Centre, Kew Bridge Road, London | Building Fabric Dilapidation Survey | General Healthcare Group Ltd | Commercial | Offices | Technical Advisory | Review the agreed schedule of conditions. Carry out a visual inspection of the external and internal building fabric. Prepare a dilapidation report with budget costs, based on the visual inspection. | 0 |
Enterprise, Peterborough | MEP scope of Works and cost plan | Enterprise | Commercial | Offices | Technical Advisory | Review FM cost schedule for Peterborough facility and comment on suitability of scope of work and cost allocation to meet the actual building reuqirements. | 0 |